Contract Description: Pump Station M Rehabilitation & Force Main Investigation-
Work Includes: Demolition of existing facility structures and equipment; rehabilitation of concrete wall surfaces & coating; replacement of wooden building walls and roof; replacement of wastewater pumps and piping, valves, pump controls equipment, electrical equipment, cathodic protection, odor control, backup generator, and HVAC system; installation and operations of temporary wastewater pumps and odor control equipment during pump station bypass; improvements to City of Alameda sidewalks, crosswalks, traffic signal and electrical utility.
Bid Address: 375 11th St, Oakland
Contract Value: $ 6.10

Information

Estimator Name: Dana Wilkins
Date of Bid Proposal Submission: 07-14-2021
Bid Due Date: 07-14-2021